| Title |
Year |
Budget |
Category |
Building[s] |
Status |
Short Description (click link for more detail) |
| Correct Life Safety Egress Deficiencies |
2003 |
$424,337.00 |
Fire Protection |
Wilson Library |
Not available at this time |
This building consists of three separate building/additions which were added over time starting in 1940 . There are a number of egress violations concerning exit corridors, exiting through adjoining spaces, location and separation of exits, dead end corridors, shafts, and door assembly ratings. |
| Electrical Improvements |
2003 |
$348,195.00 |
Electrical Systems |
Hanes Hall |
Estimated construction start November 2006 |
Hanes Hall recently had renovations to three floors – basement, 2nd and 4th . There are two floors remaining which still contain original wiring.
This project provides funds for upgrading electrical wiring and telecom wiring on the 1st and 3rd floors - 22,000 square feet.
Energy Efficient Lighting
Utilization Devices and Switches
Equipment Connections
Basic Electrical Material (conduit, wire, etc.)
Telecom wiring and equipment |
| Extend HVAC Air Distribution and Temperature Control Systems |
2003 |
$1,098,903.00 |
HVAC Systems |
Hanes Hall |
Estimated construction start November 2006 |
The st and 3rd floors are heated by steam radiators or FCUs, and are partially cooled by window air conditioners, FCUs and several small cooling-only ducted systems. These systems are in fair to poor condition, they do not introduce preconditioned ventilation air, and they contribute to poor IAQ and occupant discomfort. Provide fully ducted VAV-reheat systems throughout these floors. Include a central rest room exhaust system and DDC interface to the EMCS. |
| Exterior Stucco Restoration |
2003 |
$405,526.00 |
Structural Repairs |
New East |
Completed |
The stucco finish on the building is spalling and degrading at a rapid rate. The problem stems in trapped water. Stucco is a porous material that needs to be able to weep out trapped moisture. It also expands and requires expansion joints in its installation. |
| Foundation Water-Proofing |
2003 |
$472,450.00 |
Structural Repairs |
Graham Child Development Center & Alumni Bldg & Howell Hall & Bingham Hall |
Completed |
Frank Porter Graham Child Development Center, Alumni Hall, Howell Hall, and Bingham Hall have had long standing foundation leaks and water intrusion problems. It is necessary to excavate down to the bottom of the footings around the perimeter of these buildings. |
| Foundation Water-Proofing |
2003 |
$472,450.00 |
Structural Repairs |
Howell Hall |
Completed |
Frank Porter Graham Child Development Center, Alumni Hall, Howell Hall, and Bingham Hall have had long standing foundation leaks and water intrusion problems. It is necessary to excavate down to the bottom of the footings around the perimeter of these buildings. |
| Foundation Water-Proofing and Perimeter Drain Repairs |
2003 |
$219,532.00 |
Structural Repairs |
Gardner Hall |
Completed |
There is a problem with water intrusion and leakage into the rooms in the basement of this building. There is mold, mildew, and water damage on the interior walls. The walls of the areaways are cracked and bowed. The problem has several sources. The subterranean drain system around the perimeter of the building serves the roof leaders, landscape drains, and the areaways around the building site. |
| Foundation Water-Proofing and Perimeter Drain Repairs |
2003 |
$548,199.00 |
Structural Repairs |
Hanes Hall |
Estimated construction start November 2006 |
There is a problem with water intrusion and leakage into the rooms in the basement of this building. There is mold, mildew, and water damage on the interior walls. There are areas of brick paved walks and stairs where they have sunk due to soil settlement from water intrusion. |
| Foundation Water-Proofing, Mortar & Termite Damage Repair |
2003 |
$180,335.00 |
Structural Repairs |
Smith Bldg |
Project funding transferred to Swain Hall |
The basement floor has damaged interior finished walls and ceilings caused by moisture coming from inadequately water proofed exterior foundation wall. This can be seen in the Housekeeping room in the north-east corner of the basement. Provide a new waterproofing and perimeter drain system. |
| HVAC & Electrical Upgrade to Computing Room 37D |
2003 |
$114,257.00 |
HVAC Systems |
Phillips Hall |
Design development phase |
The ATN (Academic Technology & Networks) machine room is full and an expansion is needed. Directly below the room is room 37D that is to be converted from storage to a new computer networking equipment room. |
| Install Fire Sprinkler Protection |
2003 |
$467,227.00 |
Fire Sprinkler System |
Hanes Hall |
Estimated construction start November 2006 |
Automatic sprinkler protection is the first line of defense against fire loss and loss of life. A wet-pipe sprinkler system is recommended. Provide a new 8” sprinkler service from the main located on the west side of the building. This main will serve this building and the future sprinkler project in Gardner Hall. |
| Install Fire Sprinkler Protection |
2003 |
$1,018,518.00 |
Fire Sprinkler System |
McGavran-Greenberg Hall |
Estimated construction start March 2006 |
A wet-pipe sprinkler system serves the lab wing, and a similar system is recommended for the class / office wing. Provide a new sprinkler service with backflow preventer from the main to the west in Pittsboro Street . A pump and replacement suspended ceiling system is included in this estimate. |
| Install Fire Sprinkler Protection and Fire Alarm System |
2003 |
$278,273.00 |
Fire Protection |
Mary Anne Smith Building |
Project funding transferred to Swain Hall (Arts Common Phase I) |
A wet-pipe sprinkler system is recommended for the entire building, including the attic. Provide new sprinkler and domestic services with backflow preventers from the main to the west side of the building. A pump is required, and is included here. This project includes the installation of an addressable fire alarm system. |
| Install Pre-Heat Coils to Allow Outside Air into HVAC System (Advanced Planning) |
2003 |
$346,499.00 |
HVAC Systems |
MacNider Hall |
Design development phase |
This project is for the advance planning and design of a replacement HVAC system as explained in the following description. The design fee is 9% of the total estimated project cost of $5,679,567. |
| Interior Renovations of 1st and 3rd Floors |
2003 |
$1,048,208.00 |
Interior |
Hanes Hall |
Estimated construction start November 2006 |
This building was constructed in 1953. The interior furnishings and finishes are now over fifty years old. The organization of spaces no longer meets the functional needs of the mission of this building, based on the departmental needs. |
| Metal Roof Replacement |
2003 |
$464,893.00 |
Roof Replacement |
Howell Hall |
Completed |
The Terne Metal roof on this building was originally installed in 1907. The protective black coating has peeled off large areas exposing bare metal which has resulted in large rusted areas. |
| Metal Roof Replacement (original wing) |
2003 |
$247,879.00 |
Roof Replacement |
Davie Hall |
Completed |
none |
| Repair Exterior Masonry to Prevent Moisture Intrusion |
2003 |
$559,050.00 |
Structural Repairs |
Phillips Hall |
Completed |
This building consists of four wings built in 1918, 1925, 1927, and 1960 respectively (99,862 sqft floor area). The exterior masonry and pre-cast decorative stone work (40,000 sqft wall area) of the three older wings need to be re-pointed and in some cases removed and reset. |
| Repairs to HVAC System to Address IAQ |
2003 |
$131,498.00 |
HVAC Systems |
Fordham Hall |
Schematic design phase |
The HVAC system is sophisticated with automation designed and installed to provide adequate exhaust flow for waste air elimination. The system is malfunctioning as inspection reveals strong odors on all floors and an overall negative internal building pressure. |
| Replace DX & Window A/C with Central HVAC System |
2003 |
$1,151,993.00 |
ADA |
Mary Anne Smith Building |
Project funding transferred to Swain Hall |
The building is heated by radiators, and is partially cooled by window air conditioners and a small basement DX packaged system. Heating system failures are reportedly common. Provide a fully ducted VAV-reheat system to serve this building, including a ventilation air preconditioning system to exchange enthalpy with building exhaust. |
| Replace Existing Fire Alarm System |
2003 |
$275,778.00 |
Fire Alarm System |
Brinkhous-Bullitt Building |
Construction documents in review |
The existing fire alarm system has been pieced together with three separate systems. They are connected together electrically. The last fire alarm control panel (FACP) was installed in 1998 and functions at present for elevator capture (brings all elevators to ground floor if in an alarm state) only. |
| Replace Failing Pre-Cast Concrete Panel System |
2003 |
$278,903.00 |
Structural Repairs |
Carmichael Auditorium |
Project cancelled |
The pre-cast concrete panel system has been inspected and evaluated by an outside consulting engineering firm. Their analysis and recommendations follow: "The pre-cast concrete cladding components are showing signs of distress from long term weathering and corrosion of the internal steel reinforcement. |
| Replace HVAC System |
2003 |
$4,364,835.00 |
HVAC Systems |
Dental Research Building |
Design development phase |
It will be necessary to remove the existing ceiling in order to remove the air distribution system as required by this project. During the demolition process there will damage to adjacent wall and floor finishes. Money is being allocated for the repair and or replacement of the affected finishes.
The floor tile material in this building has been tested for asbestos and found to be positive. A plan and design for the removal of this material should be created and implemented. |
| Replace HVAC System to Address IAQ |
2003 |
$6,684,185.00 |
HVAC Systems |
Brinkhous-Bullitt Building |
Construction documents in review |
Renovate Lab HVAC System
The 100% OA HVAC system serving the labs consists of a large built-up dual duct AHU, wrapped hot/cold ductwork, and lined mixing boxes and diffusers. Several sections of the AHU are corroded and molded. Diffusers are inadequate. Rebuild the AHU, including new pre-cool and cold deck CHW coils, and provide separate hot/cold deck fans with VFD's. Replace mixing boxes, diffusers, and connecting ductwork, including suspended ceilings |
| Replace HVAC Systems |
2003 |
$766,708.00 |
HVAC Systems |
Medical School Wings B, C, D, E & F |
CD/ Awaiting BOI approval / Estimated construction start May 2006 |
The HVAC systems in Wings B, C, D, E, and F contribute to poor indoor air quality, which presents a significant challenge for the occupants due to excessive moisture. Some spaces in Wing C are not as egregious as those in other Wings. Further, some spaces in Wing C present insurmountable space access obstacles. Therefore, we recommend a change of project title and scope to include the other Wings as well. |
| Replace HVAC Systems |
2003 |
$562,398.00 |
HVAC Systems |
Person Hall |
Estimated construction start June 2006 |
It will be necessary to remove the existing ceiling in order to remove the air distribution system as required by this project. During the demolition process there will damage to adjacent wall and floor finishes. Money is being allocated for the repair and or replacement of the affected finishes. |
| Replace HVAC Systems |
2003 |
$562,398.00 |
ADA |
Replace HVAC Systems & Person Hall |
Estimated construction start June 2006 |
It will be necessary to remove the existing ceiling in order to remove the air distribution system as required by this project. |
| Roof Replacement |
2003 |
$435,008.00 |
Roof Replacement |
Roof Replacement & Caldwell Hall |
Completed |
Both the 1912 clay tile roof and the 1983 single ply EPDM have gone past their useful life cycle and need to be replaced. Provide a new clay tile roof and EPDM single ply roof. |
| Roof Restoration (1905 slate) |
2003 |
$286,501.00 |
Roof Restoration |
Bynum Hall |
Completed |
The existing slate roof is 98 years old. The felt substrate and any broken slate should be replaced. The last repairs done to the roof were in 1974. It is recommended that the roof be replaced with a historically correct copper roof. |
| Slate Roof and Low Slope Roof Sectors Restoration |
2003 |
$1,431,828.00 |
Roof Restoration |
Phillips Hall and Annex |
Completed |
The slate roof over the 1960 addition to Phillips Hall is now 43 years old and has reached its useful life expectancy. The slate should be removed, and then reinstalled over new felt substrate, while replacing all broken slate. |
| Slate Roof Restoration |
2003 |
$461,426.00 |
Roof Restoration |
Hanes Hall |
Estimated construction start November 2006 |
The roof is slate on nail-able concrete planks. The slate roof felt underlayment has rotted and needs to be replaced. |
| Slate Roof Restoration |
2003 |
$250,241.00 |
Roof Restoration |
Smith Bldg |
Project funding transferred to Swain Hall |
This slate roof (5,300SF) was installed in 1921 and has received no maintenance work other than spot repairs since then. The dormers leak. The ridges and hips leak and need to be rebuilt. |
| Window Replacement |
2003 |
$295,887.00 |
Window Systems |
Alumni Hall |
Estimated construction completion August 2006 |
The windows have recently been repainted, but none of the structural problems have been remedied. The existing windows are wood single hung type. |
| Window Replacement |
2003 |
$191,217.00 |
Window Systems |
Bynum Hall |
Estimated construction completion August 2006 |
The existing windows are wood single hung windows with some having radiused top sections. The windows have deteriorated from weather and age. They have shrunk, warped, and leak air. |
| Window Replacement |
2003 |
$426,150.00 |
Window Systems |
Hanes Hall |
Estimated construction start November 2006 |
The existing wood and steel sash windows all need replacing. The steel windows are single glazed. The steel sash frames are not thermally broken; there is a lot of condensate run off during the winter. |
| Window Replacement |
2003 |
$693,511.00 |
Window Systems |
Howell Hall |
Estimated construction completion August 2006 |
The existing windows are wood single hung windows with radius top sections and some divide light sash in places. The windows have deteriorated from weather and age. They have shrunk, warped, and leak air. |
| Window Replacement |
2003 |
$571,097.00 |
Window Systems |
Old Clinic |
Estimated construction start May 2006 |
The existing wood windows in this building are in need of replacement. They are difficult and expensive to maintain. They leak air and are energy inefficient. |
| Advanced planning for HVAC replacement and fire protection addition |
2004 |
$150,000.00 |
HVAC Systems |
Walter Davis Library |
Final report received January 2006 |
Advanced planning for HVAC replacement and fire protection addition |
| Coverage of the upper area of the EPDM roofing by adjoining new teflon to existing dome |
2004 |
$230,000.00 |
Roof Replacement |
Dean Smith Center |
Estimated construction completion August 2006 |
Replace EPDM roof |
| Foundation water-proofing |
2004 |
$100,000.00 |
Structural Repairs |
YMCA |
Estimated construction completion January 2007 |
Foundation water-proofing |
| Install and upgrade fire alarm systems and advanced planning to network addressable fire alarm systems |
2004 |
$125,000.00 |
Fire Alarm System |
Electrical Distrubtion Center & Surplus Property Warehouse |
Nash = Cancelled; Electrical Distribution Center & Surplus Warehouse = Construction phase |
Install and upgrade fire alarm systems and advanced planning to network addressable fire alarm systems |
| Install central HVAC system |
2004 |
$400,000.00 |
HVAC Systems |
YMCA |
Estimated construction completion January 2007 |
Install central HVAC system |
| Install fire sprinkler system |
2004 |
$150,000.00 |
Fire Sprinkler System |
YMCA |
Estimated construction completion January 2007 |
Install fire sprinkler system |
| Remove three underground steel fuel tanks and replace with above-ground tanks |
2004 |
$160,000.00 |
Underground Storage Tanks |
Morehead Chemistry Labs & Horney Bldg & Public Safety Bldg |
Construction phase |
Remove three underground steel fuel tanks and replace with above-ground tanks |
| Renovate 3rd floor bathroom for ADA-compliance |
2004 |
$125,000.00 |
ADA |
Thurston-Bowles Building |
Construction phase |
Renovate 3rd floor bathroom for ADA-compliance |
| Repair and replace automatic doors |
2004 |
$60,000.00 |
Interior |
Ambulatory Care Center |
Completed |
Repair and replace automatic doors |
| Replace / install emergency generators and automatic transfer switches |
2004 |
$185,000.00 |
Electrical Systems |
Carmichael Auditorium & Hamilton Hall & Graham Child Development Center & Frances Owen Blood Research Lab |
Carmichael = Completed; FPG & Frances Owen = Construction phase; Hamilton = Combined with Existing Renovation Project (Estimated construction completi |
Replace / install emergency generators and automatic transfer switches |
| Replace caulking on precast joints on the exterior of arena |
2004 |
$120,000.00 |
Structural Repairs |
Dean Smith Center |
Estimated construction completion August 2006 |
Replace caulking on precast joints on the exterior of arena |
| Replace EPDM roof |
2004 |
$470,000.00 |
Roof Replacement |
Koury Natatorium |
Estimated construction completion August 2006 |
Replace EPDM roof |
| Replace HVAC components (AHUs, condensing units & temperature control systems) |
2004 |
$165,000.00 |
HVAC Systems |
208 West Franklin Street |
Construction phase |
Replace HVAC components (AHUs, condensing units & temperature control systems) |
| Replace plumbing |
2004 |
$150,000.00 |
Plumbing |
YMCA |
Estimated construction completion January 2007 |
Replace plumbing |
| Replace three AHUs and diffusers in Banquet Room to improve IAQ |
2004 |
$130,000.00 |
HVAC Systems |
Morehead Planetarium |
Project on hold |
Replace three AHUs and diffusers in Banquet Room to improve IAQ |
| Replace three existing 40HP lab air compressors with energy-efficient radial units |
2004 |
$140,000.00 |
Air Compressors |
Thurston-Bowles Building |
Completed |
Replace three existing 40HP lab air compressors with energy-efficient radial units |
| Roof Replacement |
2004 |
$277,170.00 |
Roof Replacement |
Person Hall |
Estimated construction start June 2006 |
The Terne metal roof on Person Hall has reached the end of serviceable life. There are active leaks located at the top of the skylights. This roof has been coated several times in recent history. The gutter system allows water to escape from the roof. This project is required not only by the roof's condition but is necessitated by the upcoming comprehensive HVAC renovation project. |
| Roof Replacement (single ply EPDM roof sectors) |
2004 |
$100,000.00 |
Roof Replacement |
Aycock Family Medicine |
Completed |
Roof Replacement (single ply EPDM roof sectors) |
| Roof replacement (six roof sectors) |
2004 |
$390,000.00 |
Roof Restoration |
Morehead Planetarium |
Construction documents phase |
Roof replacement (six roof sectors) |
| Structural repairs for metal roof framing |
2004 |
$150,000.00 |
Structural Repairs |
Art Studio Building |
Completed |
Structural repairs for metal roof framing |
| Supplement to HVAC Replacement Project |
2004 |
$245,000.00 |
HVAC Systems |
208 West Franklin St. |
Construction phase (Supplement to 2004 R&R Project) |
A modernization of the HVAC system is required due to the existing systems inability to provide adequate indoor air quality and temperature control. The newly designed system will feature a new roof mounted condensing heat pump unit for each of the floors. |
| Upgrade existing analog controls for elevators with digital systems |
2004 |
$290,000.00 |
Elevator Systems |
Hamilton Hall |
Construction phase |
Upgrade existing analog controls for elevators with digital systems |
| Upgrade existing analog controls for elevators with digital systems |
2004 |
$565,922.00 |
Elevator Systems |
Mary Ellen Jones Building |
Estimated construction completion March 2007 |
Upgrade existing analog controls for elevators with digital systems |
| Upgrade lighting and electrical distribution system |
2004 |
$200,000.00 |
Electrical Systems |
YMCA |
Estimated construction completion January 2007 |
Upgrade lighting and electrical distribution system |
| Advanced Planning (design document) for Roof Replacement |
2005 |
$185,000.00 |
Roof Replacement |
Fetzer Gymnasium |
Schematic Design |
Advanced Planning (design document) for Roof Replacement |
| Advanced Planning (design document) for Roof Replacement |
2005 |
$185,000.00 |
Roof Replacement |
Student Recreation Center |
Schematic Design |
Advanced Planning (design document) for Roof Replacement |
| Advanced Planning for Architectural, Plumbing, Mechanical & Electrical Improvements |
2005 |
$300,000.00 |
Mechanical Systems |
Smith Hall (Playmakers Theater) |
Project kick-off March 9, 2006 |
The exterior renovation of Smith Hall is a bond project. The funds requested here will provide for the engineering design of the interior architectural, mechanical and electrical systems. |
| Advanced Planning for Emergency Generator Exhaust Stack Modification Requirements |
2005 |
$20,000.00 |
Electrical Systems |
Mary Ellen Jones |
Design phase |
The emergency generator's diesel exhaust system is routed from the generator room at the rear of the building, across an open area and turning 90 degrees down into the ground and exhausting through a ground level grate. |
| Advanced Planning for HVAC Replacements |
2005 |
$0.00 |
HVAC Systems |
Friday Center & Carrington Hall |
Designer selection phase |
These two buildings suffer from aging HVAC systems and poor indoor air quality. Occupant health is at risk. It may require extensive modification and repairs or a total replacement. |
| Advanced Planning for HVAC Replacements |
2005 |
$0.00 |
HVAC Systems |
Hanes Art Center |
Designer selection phase |
The main HVAC system was modified years ago, and has not been tested and balanced since installation (1982). The system is a dual duct design and the built up air handler is located in the lower level mechanical rooms. Except for the print shop and sculpture areas, the building is conditioned by this built up AHU. |
| Elevator Systems Renewal (elevator #7182) |
2005 |
$300,000.00 |
Elevator Systems |
Brinkhous-Bullitt Building |
Not available |
This elevator is one of the most heavily used on the whole UNC-CH campus. Elevator # 7182 is the elevator that connects the Morgue on the top floor of this building to the loading dock at ground level. This elevator was installed in 1973 and is reaching the end of its useful service life. |
| Elevator Systems Renewal |
2005 |
$200,000.00 |
Elevator Systems |
Greenlaw Hall |
Not available |
This elevator was installed in 1970 and has a very high usage rate. It has reached the end of its useful service life. |
| Elevator Systems Replacement (shared elevator with Old Clinic) |
2005 |
$610,000.00 |
Elevator Systems |
MacNider Hall |
Not available |
This elevator is the most heavily used on the whole UNC-CH campus. Elevator # 1505 is a shared elevator that connects MacNider and Old Clinic. |
| Foundation Waterproofing System... |
2005 |
$200,000.00 |
Structural Repairs |
Phillips Annex |
Completed |
This building has an occupied basement which is accessed by an exterior stair set in an areaway and natural light comes in through windows in an areaway. There have been water infiltration problems in the basement area of this building. |
| HVAC & Electrical Improvements |
2005 |
$1,500,000.00 |
HVAC Systems |
Rosenau Hall |
Supplement to Existing Renovation Project (Estimated construction start July 2007) |
The work includes the renovation of Rosenau Hall, a 4 story, ±120,000 GSF facility located on the campus of UNC Chapel Hill. The project encompasses the comprehensive renovation and replacement of major building systems including HVAC, plumbing, and electrical lighting, power and communications systems. |
| HVAC & Electrical Systems Renovation Supplement |
2005 |
$1,400,000.00 |
HVAC Systems |
Campus YMCA |
Supplement to Existing Renovation Project (Estimated construction completion January 2007) |
The Campus YMCA building will soon be undergoing a renovation of its external architectural surfaces.
These supplemental funds will allow the renovation of internal building areas to provide offices for the YMCA, a faculty lounge and a snack bar. Code deficiencies and deferred maintenance will also be addressed. |
| HVAC Improvements for IAQ |
2005 |
$300,000.00 |
HVAC Systems |
Medical School Wing B & Medical School Wing C & Medical School Wing D & Medical School Wings E & F |
Not available |
The Medical School Wings are cooled by old window DX units, a few DX fan coil units and heated by hot water radiators. Cooling season humidity control is difficult and evidence of mold has been detected on some walls and in some carpets. |
| HVAC Repair / Replacement |
2005 |
$225,000.00 |
HVAC Systems |
Battle Hall & Vance Hall & Pettigrew Hall |
Schematic design phase |
The air conditioning systems in these buildings were installed in 1978. There are a total of nine cooling only air handlers, one per floor of each of the three buildings. Heating is provided by wall mounted radiators connected to a circulating hot water loop. |
| Improvements to Existing Space |
2005 |
$350,000.00 |
General Renovation |
Memorial Hall |
Completed |
Memorial Hall, constructed in 1931, is the largest auditorium on the campus, with a seating capacity of 1500. This facility is used extensively for student assemblies and performances, lectures, concerts, and traveling theatrical productions. |
| Improvements to HVAC System |
2005 |
$125,000.00 |
HVAC Systems |
Coates Building |
Schematic design phase |
In lieu of a total HVAC system replacement, the ductwork and AHU can be replaced for relief of the issues that mold in the ductwork may be causing.
Remove the existing air handler and ductwork, replace with new properly sized AHU and condenser, and externally insulated ductwork. |
| Install New Fire Alarm System |
2005 |
$35,000.00 |
Fire Alarm System |
Art Studio Building |
WR 38815 |
The current fire alarm system in this building consists only of manual pull stations, and its parts can no longer be obtained from the manufacturer. |
| Install New Fire Alarm System |
2005 |
$50,000.00 |
Fire Alarm System |
Coates Building |
Design phase |
Coates building was completed in 1939 for use by the Institute of Government. The building is not protected by a fire alarm system, nor does it contain a fire sprinkler system. |
| Limestone Masonry Condition Assessment Study |
2005 |
$50,000.00 |
Structural Repairs |
Manning Hall & Alumni Bldg |
Proposal due February 6, 2006 |
Manning Hall and Alumni Hall have cut limestone pediments, columns, window surrounds, detailing, and fenestration. These materials are showing sign of stress and failure. |
| Mechanical, Electrical and Lab Safety Improvements for BSL-3 |
2005 |
$450,000.00 |
HVAC Systems |
Taylor Hall & McGavran-Greenberg Hall & Jones Bldg, Mary Ellen & Medical Biomolecular Research Bldg |
Not available |
These funds will be used to develop cost estimates, scope and design documents for safety improvements and upgrades to the following Biological Safety Labs:
Taylor Hall - Lab # 415
McGavran-Greenberg - Lab # 3221
McGavran-Greenberg - Lab # 1204
Mary Ellen Jones - Lab # 714
Mary Ellen Jones - Lab # 736
Medical Biomolecular Research Building - Lab # 8343 |
| Removal of Underground Tank |
2005 |
$25,000.00 |
Underground Storage Tanks |
Fordham Hall |
Design phase |
The University of North Carolina is in the process of removing its inventory of underground steel tanks and replacing with above ground units. |
| Repairs to Clay Tile Roof |
2005 |
$66,000.00 |
Roof Restoration |
Swain Hall |
See Arts Common Project Phase I |
An outside consulting engineering firms have performed a condition assessment report on the clay tile roof of Swain Hall. Within this report are repair recommendations to extend the useful service life to this roof. |
| Replace 1964 Addition Built-Up Roof |
2005 |
$300,000.00 |
Roof Replacement |
Wilson Hall |
Estimated construction start October 2006 |
The asphalt built-up roof on this building was installed in 1985. It has reached the end of its expected useful life cycle and needs to be replaced. UNC Design and Construction Guidelines for Employee Fall Protection are provided for easy reference. |
| Replace AHU # 2 |
2005 |
$65,000.00 |
HVAC Systems |
Swain Hall |
Schematic design phase |
AHU-2 (Prop Room)
Replace AHU-2. It is located in the Swain Hall addition prop room, above the restrooms, and serves the adjoining first floor central offices. It was installed in the mid 1960's and suffers from leakage, corrosion and mold build up. |
| Replace AHU # 7 |
2005 |
$285,000.00 |
HVAC Systems |
Swain Hall |
Combined with Arts Common Project |
Replace AHU-7. It serves the studio area and east upper floor office areas of old Swain Hall. It was installed in the mid 1960's and suffers from condensate leakage, vibration and corrosion. |
| Replace Built-Up Roof & Composition Shingles at Reading Room, Ballasted EPDM Roof for 10th Floor, and Repair Roof Sectors for 3rd, 4th & 8th Floors |
2005 |
$350,000.00 |
Roof Replacement |
Walter Davis Library |
Design phase |
This building has three types of roofs:
• Ballasted EPDM roof system
• Asphalt impregnated mineral surfaced shingles
• Asphalt built-up roofs |
| Replace Covered Passage Roof and Repair Kennel Roof |
2005 |
$80,000.00 |
Roof Replacement |
Frances Owen Research Lab |
Programming & revising scope |
This building has four distinct roof sectors:
Laboratory – Asphalt Built Up Roof
Covered Passage - Asphalt Built Up Roof
North Kennel - Asphalt Built Up Roof
South Kennel - Asphalt Built Up Roof
These roofs were inspected by Rooftop Systems Engineers, an outside consulting engineering firm, as part of the preparation of a condition assessment report. That report is provided here for reference. Also, UNC Design and Construction Guidelines for Employee Fall Protection are provided fo |
| Replace Electrical Service Switchgear |
2005 |
$115,000.00 |
Electrical Systems |
Hamilton Hall |
Combined with Existing Renovation Project (Estimated construction completion August 2007) |
The main electrical switchgear unit in Hamilton Hall is located in the basement electrical room. This unit is in poor condition with rust and corrosion on external surfaces. |
| Replace Emergency & Exit Lights |
2005 |
$35,000.00 |
Emergency & Exit Lights |
Coates Building & Horney Bldg & Art Studio Bldg & Lineberger Cancer Research Center |
Coates = Design / fast track |
• Emergency Lights: The building does contain some battery operated emergency light fixtures. However, not all were operable and more should be added at critical points to aid occupants in the event of an outage. |
| Replace Emergency Generator |
2005 |
$175,000.00 |
Electrical Systems |
MacNider Hall |
Construction document completion March 2006 |
The emergency generator is at the end of its theoretical life; it is the oldest on campus and the manufacturer will no longer supply spare parts. |
| Replace Existing Dry Type Fire Sprinkler System |
2005 |
$122,900.00 |
Fire Sprinkler System |
Carolina Living & Learning Center, Phase I |
Estimated construction completion March 2006 |
Carolina Living and Learning Center, Phase I, is protected by a dry pipe light hazard fire sprinkler system. It is supplied by a 6" main and the concrete sprinkler vault is buried outside the premises. |
| Replace Metal Shingles with Composition Shingles |
2005 |
$225,000.00 |
Roof Replacement |
Abernethy Hall |
Not available |
The high slope pitched roof of this building was constructed in three phases, consisting of the original 1907 building and two additions built in 1924 and 1939. The roofing material is a zinc coated steel shingle system with liquid applied weather coating. |
| Replace Plumbing Piping Systems and Fixtures |
2005 |
$800,000.00 |
Plumbing |
Hanes Hall |
Not available |
This building utilizes a typical domestic services piping system that is more than 55 years old and is in poor condition. Leakage and blockages in the sanitary and domestic water system is occurring. |
| Replace Slate Roof and Repairs to Cupola |
2005 |
$400,000.00 |
Roof Replacement |
Carroll Hall |
Project kick-off February 16, 2006 |
The roof and cupola were inspected by Rooftop Systems Engineers, an outside consulting engineering firm, as part of the preparation of a condition assessment report. That report is provided here for reference. Also, UNC Design and Construction Guidelines for Employee Fall Protection are provided for easy reference.
SLATE ROOF:
This slate roof is in poor condition. The slate shingles show significant weathering and there has been a significant amount of breakage. Many shingles have been repla |
| Replace Terne Metal Roof |
2005 |
$350,000.00 |
Roof Replacement |
New East |
Estimated construction start July 2006 |
The existing metal roof is approximately 26 years old. An outside consulting engineering firm was hired to provide a condition assessment report for the roof of this building. That report is provided here for reference. |
| Replace two AHUs in 1961 Building |
2005 |
$245,000.00 |
HVAC Systems |
Hill Hall |
Construction document completion May 2006 |
Replace the two (2) air handling units in the attic of the 1961 addition of Hill Hall, which are past their life expectancy. These two units are leaking condensate on to the ceiling below, and are suffering from drain pan corrosion. Being 45 years old and obsolete, repair parts are difficult to obtain. |
| Reseal Joints at Vertically-Applied Slate and Windows at Reading Room |
2005 |
$175,000.00 |
Structural Repairs |
Walter Davis Library |
Design phase |
The north elevation of the Reading Room consists of a series of eleven (11) compound projection window walls, which are divided by ten (10) vertical slate-faced walls that terminate at dormer windows. |
| Supplement to HVAC Replacement Project |
2005 |
$245,000.00 |
HVAC Systems |
208 West Franklin St. |
Construction phase (Supplement to 2004 R&R Project) |
Supplement to HVAC Replacement Project |
| Window Replacement in 1960 Addition |
2005 |
$750,000.00 |
Window Replacement |
Peabody Hall |
Estimated construction start June 2006 |
The windows in the 1960 portion of Peabody Hall are single hung painted wood sash and frames and are glazed with single plain glass. They are expensive to maintain, leak air, and are energy inefficient. |
| Advanced Planning (design document) for Roof Replacement |
2006 |
$185,000.00 |
Roof Replacement |
Student Recreation Center & Fetzer Gym |
Schematic Design |
Advanced Planning (design document) for Roof Replacement |
| Advanced Planning for HVAC in Animal Care Facility and Master Planning for the Laboratory Animal Medicine Buildings (DLAM) |
2006 |
$500,000.00 |
HVAC Systems |
Animal Care Facility (Research Res. Facility A) |
Not available |
Advanced Planning for HVAC in Animal Care Facility and Master Planning for the Laboratory Animal Medicine Buildings (DLAM) |
| Advanced Planning for Life Safety Improvements |
2006 |
$30,000.00 |
Life Safety |
Coates Building |
Not available |
Advanced Planning for Life Safety Improvements |
| Advanced Planning for New Fire Alarm System |
2006 |
$25,000.00 |
Fire Protection |
Woollen Gymnasium |
Not available |
Advanced Planning for New Fire Alarm System |
| Advanced Planning for Window Replacement |
2006 |
$90,000.00 |
Window Replacement |
Beard Hall |
Not available |
Advanced Planning for Window Replacement |
| Advanced Planning to Replace 2nd & 3rd Floor HVAC Systems |
2006 |
$50,000.00 |
HVAC Systems |
Knapp-Sanders Building |
Not available |
Advanced Planning to Replace 2nd & 3rd Floor HVAC Systems |
| Advanced Planning to Replace Sanitary Piping System |
2006 |
$350,000.00 |
Plumbing |
Wilson Hall & Coker Hall |
Not available |
Advanced Planning to Replace Sanitary Piping System |
| Clean HVAC Ductwork, Replace Filtration System, and Outside/Mixed Air Dampers |
2006 |
$150,000.00 |
HVAC Systems |
Aycock Family Medicine |
Completed |
Clean HVAC Ductwork, Replace Filtration System, and Outside/Mixed Air Dampers |
| Install New ADA-Compliant Elevator |
2006 |
$500,000.00 |
ADA |
Bynum Hall |
Not available |
Install New ADA-Compliant Elevator |
| Remove Underground Storage Tanks |
2006 |
$75,000.00 |
Underground Storage Tanks |
Berryhill Hall & Phillips Hall |
Not available |
Remove Underground Storage Tanks |
| Replace Auditorium Fixed Seating, Floor and Wall Finishes |
2006 |
$951,000.00 |
General Renovation |
Hill Hall |
Not available |
The scope of work for this project includes the following:
- Replace the existing carpeting with new;
- Replace the existing auditorium seating with appropriate new seating, meeting the UNC-CH standards;
- Repaint the auditorium walls and ceilings. |
| Replace Bowman-Gray Swimming Pool Filtration System |
2006 |
$95,000.00 |
Mechanical Systems |
Woollen Gymnasium |
Not available |
Replace Bowman-Gray Swimming Pool Filtration System |
| Replace Existing Basement HVAC, Plumbing, and Electrical Systems, and Architectural Finishes |
2006 |
$2,300,000.00 |
Building Systems |
Bynum Hall |
Not available |
Replace Existing Basement HVAC, Plumbing, and Electrical Systems, and Architectural Finishes |
| Replace HVAC Temperature Control Systems |
2006 |
$200,000.00 |
HVAC Systems |
Kerr Hall, & Taylor Hall & Friday Center, William & Ida |
Not available |
Replace HVAC Temperature Control Systems |
| Replace Second Boiler and Associated Piping |
2006 |
$20,000.00 |
HVAC Systems |
Graham Memorial |
Not available |
Replace Second Boiler and Associated Piping |
| Roof Fall Protection |
2006 |
$100,000.00 |
Roof Fall Protection |
Hanes Hall |
Combined with roof replacement project. Design Development |
Roof Fall Protection |
| Roof Fall Protection |
2006 |
$300,000.00 |
Roof Fall Protection |
South Bldg & Gardner Hall & Saunders Hall |
Completed |
short desc |
| Roof Fall Protection |
2006 |
$300,000.00 |
Roof Fall Protection |
South Building, & Gardner Hall & Saunders Hall |
Not available |
Roof Fall Protection |
| Seal Fire-Rated Assemblies |
2006 |
$150,000.00 |
Fire Protection |
MacNider Hall & Bingham Hall & Taylor Hall & Alumni Bldg |
Not available |
Seal Fire-Rated Assemblies |
| Seal Fire-Rated Assemblies |
2006 |
$100,000.00 |
Fire Protection |
Thurston Bowles Building & Lineberger Cancer Research Center |
Not available |
Fire Alarm Networking System |
| Supplement to Current Foundation Waterproofing Project |
2006 |
$25,000.00 |
Structural Repairs |
Phillips Annex |
completed |
This building has an occupied basement which is accessed by an exterior stair set in an areaway and natural light comes in through windows in an areaway. There have been water infiltration problems in the basement area of this building. |
| Supplement to Current General Renovation Project |
2006 |
$1,500,000.00 |
General Renovation |
Berryhill Hall |
See current CIP project for more information |
Supplement to Current General Renovation Project |
| Supplement to Current General Renovation Project |
2006 |
$2,200,000.00 |
General Renovation |
Steele Building |
See current CIP project for more information |
Supplement to Current General Renovation Project |
| Supplement to Current HVAC and Window Replacement Project |
2006 |
$500,000.00 |
Building Systems |
Medical School Wings & Medical School Wing B & Medical School Wing C & Medical School Wing D & Medical School Wings E & F |
See current CIP project for more information. |
General Construction
The HVAC systems in Wings B, C, D, E, and F contribute to poor indoor air quality, which presents a significant challenge for the occupants due to excessive moisture. Some spaces in Wing C are not as egregious as those in other Wings. Further, some spaces in Wing C present insurmountable space access obstacles. Therefore, we recommend a change of project title and scope to include the other Wings as well. |
| Advance Planning for Comprehensive Renovation |
2007 |
$750,000.00 |
General Renovation |
Morehead Planetarium and Science Center |
Not available |
Advance Planning for Comprehensive Renovation |
| Advance Planning for Comprehensive Renovation. |
2007 |
$250,000.00 |
General Renovation |
Carrington Hall |
Not available |
Advance Planning for Comprehensive Renovation |
| Air Handler Unit #4 Replacement |
2007 |
$250,000.00 |
Electrical Systems |
Beard Hall |
Not available |
Air Handler Unit #4 Replacement |
| Biosafety Level 3 Lab Upgrade to Meet Codes and Standards |
2007 |
$550,000.00 |
Electrical Systems |
Taylor Hall |
Not available |
Biosafety Level 3 Lab Upgrade to Meet Codes and Standards |
| Construction Document Design Phase for Interior Renovation |
2007 |
$200,000.00 |
General Renovation |
Smith Hall |
Not available |
Construction Document Design Phase for Interior Renovation |
| Design for Fire Protection and Egress |
2007 |
$150,000.00 |
Fire Protection |
Woollen Gymnasium |
Not available |
Design for Fire Protection and Egress |
| Elevator Modernization |
2007 |
$300,000.00 |
ADA |
Beard Hall |
Not available |
Elevator Modernization |
| Elevator Modernization |
2007 |
$175,000.00 |
ADA |
Frank Porter Graham Child Development Center |
Not available |
Elevator Modernization |
| Elevator Modernization |
2007 |
$400,000.00 |
ADA |
Woollen Gymnasium |
Not available |
Elevator Modernization |
| Exterior Envelope restoration to preserve the historic landmark |
2007 |
$500,000.00 |
General Renovation |
Old East |
Not available |
Exterior Envelope restoration to preserve the historic landmark |
| Foundation Water-Proofing |
2007 |
$50,000.00 |
Structural Repairs |
Hamilton Hall |
Not available |
Foundation Water-Proofing |
| Fuel Storage Tank Removal |
2007 |
$55,300.00 |
Underground Storage Tanks |
McGavran-Greenberg & Henderson Street, 214 |
Not available |
Fuel Storage Tank Removal |
| Heating, Ventilating and Air Conditioning Temperature Control Replacements |
2007 |
$300,000.00 |
HVAC Systems |
Friday Center |
Not available |
Heating, Ventilating and Air Conditioning Temperature Control Replacements |
| Install New Fire Alarm System |
2007 |
$40,000.00 |
Fire Alarm System |
Albert and Gladys Coates Building |
Not available |
Install New Fire Alarm System |
| Install New Fire Alarm System |
2007 |
$80,000.00 |
Fire Alarm System |
Mary Ann Smith Building |
Not available |
Install New Fire Alarm System |
| Install New Fire Alarm System |
2007 |
$375,000.00 |
Fire Alarm System |
Woollen Gymnasium |
Not available |
Install New Fire Alarm System |
| Install New Fire Sprinkler System |
2007 |
$500,000.00 |
Fire Sprinkler System |
Bynum Hall |
Not available |
Install New Fire Sprinkler System. |
| Install New Fire Sprinkler System |
2007 |
$1,200,000.00 |
Fire Sprinkler System |
Lewis Hall & Everett Res Hall & Stacy Res Hall |
Not available |
Install New Fire Sprinkler System. |
| Restroom and Entrance Additions |
2007 |
$1,000,000.00 |
ADA |
Bynum Hall |
Not available |
Restroom and Entrance Additions |
| Retro-commissioning of Heating, Ventilating & Air Conditioning Systems |
2007 |
$200,000.00 |
Electrical Systems |
Memorial Hall |
Not available |
Retro-commissioning of Heating, Ventilating & Air Conditioning Systems |
| Roof and Envelope Repairs |
2007 |
$435,000.00 |
Roof Restoration |
Coastal Process and Environmental Health Lab |
Not available |
Roof and Envelope Repairs |
| Stormwater Storage (55,000 cubic feet) and Piping Improvements |
2007 |
$1,000,000.00 |
Infrastructural Improvements |
Bell Tower Development |
Not available |
Stormwater Storage (55,000 cubic feet) and Piping Improvements |
| Structural Repairs |
2007 |
$40,000.00 |
Structural Repairs |
Francis Owen Laboratory |
Not available |
Structural Repairs |
| Supplement to Comprehensive Renovation |
2007 |
$1,354,900.00 |
General Renovation |
Rosenau Hall |
Not available |
Supplement to Comprehensive Renovation |
| Water Main Improvements |
2007 |
$30,000.00 |
Infrastructural Improvements |
Cameron Avenue |
Not available |
West Main Improvements |
| Water Supply Looping Connection Improvements |
2007 |
$350,000.00 |
Infrastructural Improvements |
Bell Tower Development |
Not available |
Water Supply Looping Connection Improvements |
| Window Replacement |
2007 |
$950,000.00 |
Window Replacement |
Beard Hall |
Not available |
Window Replacement |