Project Name:
HVAC & Electrical Systems Renovation Supplement
Project Category:
HVAC Systems
Status:
Supplement to Existing Renovation Project (Estimated construction completion January 2007)
Associated Capital Improvement Project:
1998 REPAIRS AND RENOVATIONS
Long Description:
The Campus YMCA building will soon be undergoing a renovation of its external architectural surfaces.
These supplemental funds will allow the renovation of internal building areas to provide offices for the YMCA, a faculty lounge and a snack bar. Code deficiencies and deferred maintenance will also be addressed.
The mostly original domestic and sanitary sewer piping systems will be replaced and the restrooms upgraded to meet ADA requirements. Building egress issues will be rectified. A new centralized HVAC system will be installed so that proper temperature and humidity control can be achieved. The outdated electrical distribution system will be replaced and the lighting system modernized. A wet pipe fire sprinkler system will be installed for occupant safety.