Project Name:
Replace HVAC Systems
Project Category:  
HVAC Systems
Facility:
Medical School Wings B, C, D, E & F
Year:
2003
Budget:
$766,708.00
Designer Name:
Manager Name:
Contact Name:
Status:
CD/ Awaiting BOI approval / Estimated construction start May 2006
Associated Capital Improvement Project:
1998 REPAIRS AND RENOVATIONS
Long Description:
The HVAC systems in Wings B, C, D, E, and F contribute to poor indoor air quality, which presents a significant challenge for the occupants due to excessive moisture. Some spaces in Wing C are not as egregious as those in other Wings. Further, some spaces in Wing C present insurmountable space access obstacles. Therefore, we recommend a change of project title and scope to include the other Wings as well. Contaminated carpets are now being replaced exposing the original asbestos floor tile that will have to be abated, if it has become friable. During the course of installing the new HVAC systems, asbestos insulations that are present on some heating water and domestic water piping will need to be abated, if it is found in a friable condition.
Return to Project Selection
© The University of North Carolina at Chapel Hill,  All Rights Reserved